Thu 6th December 2001


The gates are installed at Lock 5

Photo
Preparing to lift the first head gate at 10.15.
Photo
The first gate is carefully lowered into position.
Photo
The bearings for the tail gates wait their turn.
Photo
Some adjustments are required to the second head gate.
Photo
Some site fencing has to be moved before the first balance beam can be lowered into position.
Photo
The tail-gate paddles are made of a plastic material which slides more easily than metal.
Photo
The balance beam is bolted into position.
Photo
The second balance beam is lowered into position.
Photo
The gates are installed by 11.15.
Photo
Close-up of the head gates.
Photo
Date plaque on one of the head gates.
Photo
The first of the tail gate balance beams, complete with paddle gear, is lowered into position and bolted into place at 14.00 and that is when I had to leave.
Send questions and comments to RLT@aaug.net

Last Revised: Fri 1st March 2002

Copyright © 2001-2002 by John Clegg, Cliff Fazackerley and the Ribble Link Trust Ltd.


Back to the News page.
On to the Next page.
Back to the Contents page.